Nationwide Fiber Optic Infrastructure for Government Connectivity

Overview

CKZ Group Limited was contracted by a government agency to design, deploy, and commission a high-capacity fiber optic network spanning over 1,000 kilometers. The goal was to enhance digital infrastructure and connect regional headquarters, border control points, hospitals, and critical government installations with a fast and reliable data backbone.

Our Approach

We began with a comprehensive route survey to map terrain, traffic, and environmental risks. Using precision GIS tools and AutoCAD Civil 3D designs, we charted optimal paths for underground deployment. Our team then carried out trenching, duct installation, cable laying, splicing, and link testing using industry-standard OTDR (Optical Time-Domain Reflectometer) equipment. All installations adhered to international TIA/EIA-568 and ITU-T standards.

Rsults

  • Seamless integration with existing core networks

  • 99.99% uptime after 12 months of operation

  • Full redundancy and ring topology for self-healing capability

  • Over 1,000km of armored fiber deployed ahead of schedule

This project reinforced our capacity to deliver mission-critical infrastructure for national digital transformation efforts.