4G/LTE Tower Construction and Rural Connectivity Rollout

Overview

In partnership with a telecom operator, CKZ Group Limited executed a full-scope 4G tower build in a remote underserved county, aiming to bridge the digital divide for over 200,000 residents and small businesses.

Our Approach

From site acquisition and permitting to civil works and rigging, our teams coordinated all aspects of tower construction. The 45-meter self-supporting tower was equipped with microwave links and 4G radio equipment. A solar-hybrid power solution with lithium-ion battery backup was integrated to ensure uptime in an off-grid environment.

We aligned and optimized point-to-point radio links using advanced spectrum analyzers and configured the Base Transceiver Station (BTS) to support both voice and data services including VoLTE (Voice over LTE).

Rsults

  • Expanded network coverage to a 40km radius

  • Enabled mobile banking, e-learning, and telemedicine

  • Reduced network latency by 70%

  • Compliant with CA and ITU-T guidelines

The project demonstrated CKZ Group Limited’s capacity to extend critical infrastructure to hard-to-reach regions, supporting inclusive connectivity.